Skip to content

Enable gosec G104 test#3936

Merged
parametalol merged 1 commit intomasterfrom
michael/gosec-G104-enable
Nov 29, 2022
Merged

Enable gosec G104 test#3936
parametalol merged 1 commit intomasterfrom
michael/gosec-G104-enable

Conversation

@parametalol
Copy link
Contributor

@parametalol parametalol commented Nov 29, 2022

Description

Follow-up on #3610.

Checklist

  • Investigated and inspected CI test results
  • Unit test and regression tests added
  • Evaluated and added CHANGELOG entry if required
  • Determined and documented upgrade steps
  • Documented user facing changes (create PR based on openshift/openshift-docs and merge into rhacs-docs)

Testing Performed

CI

@ghost
Copy link

ghost commented Nov 29, 2022

Images are ready for the commit at 40c339c.

To use with deploy scripts, first export MAIN_IMAGE_TAG=3.73.x-92-g40c339c3f8.

@parametalol parametalol requested a review from janisz November 29, 2022 10:23
This was referenced Nov 29, 2022
@parametalol parametalol merged commit c35562c into master Nov 29, 2022
@parametalol parametalol deleted the michael/gosec-G104-enable branch November 29, 2022 15:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants